On Aug. 26 the Texas Water Development Board (TWBD) met. This report covers the agenda items taken up regarding outreach efforts, approving the agency budget, a discussion on drought conditions and an amendment relating to groundwater management areas.

Discussion regarding outreach efforts and activities by the Board

  • Carlos Rubinstein’s last TWDB meeting
  • Kathleen Jackson visited Paris, Texas and toured Kimberly-Clark and Campbell’s Soup both of which effectively utilize water
  • Jackson also visited Irving to speak at Transportation And Water Summit
  • Bech Bruun attended press conferences with comptroller Hager in Austin and in San Antonio regarding Water Smart

 
Chris Hayden, Briefing discussion and consider approving the FY 2016 Budget

  • 2 additional FTEs in 2016 as part of HB 30 for brackish ground water
  • 327.1 FTE cap in 2016
  • Operations and Administration, Agency wide budget, and debt service are amongst biggest changes to the bracket
  • FY 2016 budget passes

 
Larry French, Consider amending the boundary between Groundwater Management Area 2 and Groundwater Management Area 6 that currently runs through a portion of the Mesquite Groundwater Conservation District

  • Current boundary follows county lines, proposed boundaries would be redrawn in two counties to be more in line with current aquafer limits
  • GCD 6 boundary would shift to the west
  • Executive administrator recommends approval
  • Approved

 
Briefing and discussion on drought conditions in the state of Texas

  • We are better off than in August of last year, but we have dried up some since July
  • Reservoirs have not been impacted too much at this point
  • July-September Texas is projected to be “mostly drier than normal”, but in October – December, all of Texas will be “wetter than normal”